- Detailed excavation
- Suspended slabs on ground over a 50 mm void former
- Concrete balance and backwash tanks
- Tiered seating
- Supply of precast stair treads

Case Study
Gippsland Regional Aquatic Centre
At a glance
THE DETAILS
Client
ADCO Constructions (head contractor)
Location
Traralgon, Victoria
GBG Division
Civil Construction
Sector
Community infrastructure
Delivery Period
Completed 2021
What we delivered
SCOPE OF WORKS
The story
HOW IT CAME TOGETHER
GBG delivered the civil and concrete works for the Gippsland Regional Aquatic Centre in Traralgon as subcontractor to ADCO Constructions, completing the package in 2021.
The scope included detailed excavation, suspended slabs on ground over a 50 millimetre void former, and the construction of multiple concrete balance and backwash tanks. GBG also built the tiered seating and supplied the precast stair treads.
Watch
SEE IT IN MOTION
▶
Project video coming soon