- Manufacture and installation of more than 200 precast footings
- Foundations for vessels and steel modules
- Ground slabs
- Concrete pits and HDPE pipe installation
- Pile cap break-back
- Earthing, excavation and backfill

Case Study
Orbost Gas Plant
At a glance
THE DETAILS
Client
Location
Orbost, Victoria
GBG Division
Civil Construction
Sector
Energy and industrial
Delivery Period
Completed 2018
What we delivered
SCOPE OF WORKS
The story
HOW IT CAME TOGETHER
GBG delivered the civil and concrete works for the Orbost Gas Plant upgrade in East Gippsland, completing the package in 2018. The project was valued at more than $6 million and drew on a workforce of more than 50, with around 90 per cent of the works finished within a six-month period.
The scope combined precast and in-situ concrete. GBG manufactured and installed more than 200 precast footings and constructed the foundations for the plant's vessels and steel modules, along with ground slabs and concrete pits.
Supporting civil works included pile cap break-back, HDPE pipe installation, earthing, excavation and backfill.