RAAF Base East Sale Redevelopment
Case Study

RAAF Base East Sale Redevelopment

Location
East Sale, Victoria
Division
Civil Construction
At a glance

THE DETAILS

Client
Thiess (head contractor)
Location
East Sale, Victoria
GBG Division
Civil Construction
Sector
Defence
Delivery Period
Completed 2014
What we delivered

SCOPE OF WORKS

  • Piling works
  • Strip and pad footings and raft slabs
  • Concrete stairs
  • Supply and erection of precast panels, including the multi-level tower core
  • Wet joints between precast elements
  • Bondek suspended slabs
The story

HOW IT CAME TOGETHER

GBG delivered the civil, in-situ concrete and precast works for the RAAF Base East Sale Redevelopment as subcontractor to Thiess, completing the package in 2014. The works covered a new air traffic control tower, an air traffic training facility and a physical fitness centre.

The centrepiece was the multi-level precast core of the control tower, manufactured by GBG and erected on site with wet joints between the panels. In-situ works included piling, strip and pad footings, raft slabs, concrete stairs and Bondek suspended slabs.

The package was valued at approximately $3 million and ran across two work fronts, with around 30 GBG employees on site.

Watch

SEE IT IN MOTION

▶
Project video coming soon
Watch with sound
GBG construction team working on a large concrete project

LET'S DISCUSS YOUR PROJECT

Talk to GBG about the concrete, construction and project support your next job needs.

Talk to Our Team