- Manufacture of approximately 650 retaining wall panels
- Architectural pattern formed with a polymer formliner
- Earth-strap retaining wall system
- Production sequenced to a strict delivery timeframe
- Supply to site

Case Study
South Gippsland Highway Level Crossing Removal
At a glance
THE DETAILS
Client
Location
Dandenong South, Victoria
GBG Division
Precast Concrete
Sector
Transport infrastructure
Delivery Period
What we delivered
SCOPE OF WORKS
The story
HOW IT CAME TOGETHER
GBG manufactured and supplied approximately 650 earth-strap retaining wall panels for the level crossing removal on the South Gippsland Highway in Melbourne's south-east.
Each panel carries an architectural pattern, formed in the casting bed with a polymer formliner. Production at GBG's Sale facility was planned and sequenced to meet a strict delivery timeframe.