On the Fulham Correctional Centre Project GBG personnel worked with the designers to reduce the number of over all precast elements which therefore made the installation process more efficient to get the project completed on time.
A high level of coordination was required with various trades during the development of the precast shop details to ensure panel size, panel connections, service installation & penetrations were in the correct position.
Works Included:
On the Fulham Correctional Centre Project GBG personnel worked with the designers to reduce the number of over all precast elements which therefore made the installation process more efficient to get the project completed on time.
A high level of coordination was required with various trades during the development of the precast shop details to ensure panel size, panel connections, service installation & penetrations were in the correct position.
Works Included: