GBG constructed and delivered 350No pre-cast planks which were installed at the Port Welshpool Long Jetty Project in 2017 for SMC Marine. These pre-cast planks we poured over the top of steel beams that formed part of the substructure frame and the jetty. The pre-cast planks were poured using a marine grade S50MPa concrete
Project value $1.3M