Projects – Orbost Gas Plant Upgrade

Orbost Gas Plant Upgrade

The Orbost Gas Plant Project civil works were completed by GBG in 2018.

The $6Million + project required a work force of over 50 to complete the job, with 90% of the works being finished within a 6-month period.

Works Included:

  • Pile cap break back
  • Manufacture & installation of over 200 precast footings
  • Foundations for various vessels & steel modules
  • Concrete pit & HDPE pipe system installation
  • Ground slabs
  • Earthing excavation & backfill
11

Orbost Gas Plant Upgrade

The Orbost Gas Plant Project civil works were completed by GBG in 2018.

The $6Million + project required a work force of over 50 to complete the job, with 90% of the works being finished within a 6-month period.

Works Included:

  • Pile cap break back
  • Manufacture & installation of over 200 precast footings
  • Foundations for various vessels & steel modules
  • Concrete pit & HDPE pipe system installation
  • Ground slabs
  • Earthing excavation & backfill