GBG was awarded approximately 650No earth strap retaining wall panels as part of works on the level crossing removal project at South Gippsland Highway. These panels consisted of an architectural pattern on the face of the panels which was constructed using a polymer formliner.
Critical planning and sequencing of the panels was required to ensure elements were able to be delivered to meet the project strict time frame.
GBG was awarded approximately 650No earth strap retaining wall panels as part of works on the level crossing removal project at South Gippsland Highway. These panels consisted of an architectural pattern on the face of the panels which was constructed using a polymer formliner.
Critical planning and sequencing of the panels was required to ensure elements were able to be delivered to meet the project strict time frame.