Client: McConnell Dowel – Western Program Alliance
Pre-cast crosshead and barrier package
Works consisted of:
Supply of 3No large crossheads with the largest being in excess of 150ton. This is the largest pre-cast structure GBG has manufactured and transported from our Sale yard. The 3No crossheads were poured using fabricated steel shutters to provide a class 1 finish.
Hi-Haul Transport were engaged to transport these beams with permits negotiated with Department of Transport many months before being required on site.
Old Geelong Road
Client: McConnell Dowel – Western Program Alliance
Pre-cast crosshead and barrier package
Works consisted of:
Supply of 3No large crossheads with the largest being in excess of 150ton. This is the largest pre-cast structure GBG has manufactured and transported from our Sale yard. The 3No crossheads were poured using fabricated steel shutters to provide a class 1 finish.
Hi-Haul Transport were engaged to transport these beams with permits negotiated with Department of Transport many months before being required on site.